ITAC Assessment: ND0259
ITAC logo
ITAC Assessment: ND0259
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product wood store fixtures
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 76,000
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 3,900
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,350 457,796
kWh
Natural Gas $21,548 4,246
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,584 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,565

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.4133: Use most efficient type of electric motors $331 $897 $331
6,448
kWh
- - - - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $704 $310 $704
14,068
kWh
- - - - - -
03 2.4221: Install compressor air intakes in coolest locations $177 $300 $177
3,517
kWh
- - - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $215 $46 $215
4,396
kWh
- - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $51 $120 $51
879
kWh
- - - - - -
06 2.8123: Pay utility bills on time $72 - - - - - $72 - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $254 $150 $254
4,982
kWh
- - - - - -
08 2.7447: Install vinyl strip / high speed / air curtain doors $64 $73 - $64
-
MMBtu
- - - - -
09 2.6218: Turn off equipment when not in use $19 $37 $19
293
kWh
- - - - - -
10 2.8112: Combine utility meters $342 $1,300 - - - - $342 - -
11 4.322: Eliminate old stock and modify inventory control $53,610 $15,230 - - - - - - $53,610
12 3.2123: Convert to high volume low pressure (hvlp) paint guns $2,345 $800 - - $255
-
gal
- - $2,090 -
13 3.1191: Change procedures / equipment / operating conditions $400 $225 - - - $400
-
lb
- - -
TOTAL RECOMMENDED $58,584 $19,488 $1,751
34,583
kWh
$64
-
MMBtu
$255
-
gal
$400
-
lb
$414 $2,090 $53,610
TOTAL IMPLEMENTED $54,565 $16,433 $819
16,119
kWh
$64
-
MMBtu
- - $72 - $53,610
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs