ITAC Assessment: ND0251
ITAC logo
ITAC Assessment: ND0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Steel Pieces
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 7,104
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,531 754,982
kWh
Electricity Demand $26,020 2,317
kW-mo/yr
Electricity Fees $290 -
Natural Gas $9,197 2,157
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,591 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $263 $397 n/a $139
2,345
kWh
$124
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $149 $200 n/a $149
3,810
kWh
- - -
03 2.6218: Turn off equipment when not in use $57 $84 n/a $57
1,465
kWh
- - -
04 2.6218: Turn off equipment when not in use $42 $7 n/a $42
1,172
kWh
- - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $409 $850 n/a - - $409
-
MMBtu
-
06 2.7111: Reduce illumination to minimum necessary levels $2,312 $300 n/a $1,225
31,360
kWh
$1,087
-
kW-mo/yr
- -
07 2.4133: Use most efficient type of electric motors $2,969 $4,450 n/a $1,574
40,152
kWh
$1,395
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $39 $60 n/a $39
879
kWh
- - -
09 2.4221: Install compressor air intakes in coolest locations $1,292 $360 n/a $1,292
33,118
kWh
- - -
10 2.2437: Recover waste heat from equipment $2,510 $360 n/a - - $2,510
-
MMBtu
-
11 3.3122: Use filtration, centrifuging to remove contaminants $18,549 $660 n/a - - - $18,549
-
gal
TOTAL RECOMMENDED $28,591 $7,728 $4,517
114,301
kWh
$2,606
-
kW-mo/yr
$2,919
-
MMBtu
$18,549
-
gal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs