ITAC Assessment: UL2416
ITAC logo
ITAC Assessment: UL2416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Adhesives and Coatings
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 38
Plant Area 53,000
ft2
Annual Production 4,200
ton
Production Hrs. Annual 6,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,999 4,108,520
kWh
Electricity Demand $188,364 8,594
kW-mo/yr
Electricity Fees $32,273 -
Natural Gas $90,393 11,134
MMBtu
TOTAL YEARLY COSTS $445,029
RECOMMENDED SAVINGS* $96,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $20,797 $16,250 - - $20,797 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $565 $273 $113
3,439
kWh
$452
-
kW-mo/yr
- -
03 2.7144: Install spectral reflectors / delamp $276 - $55
1,680
kWh
$221
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $139 $469 $139
4,198
kWh
- - -
05 2.7292: Lower ceiling to reduce conditioned space $4,975 $8,000 $4,975
150,743
kWh
- - -
06 2.2692: Use outside cold water source as a supply of cooling water $23,980 $43,234 $10,230
313,658
kWh
$13,750
-
kW-mo/yr
- -
07 2.2136: Install / repair insulation on steam lines $743 $660 - - - $743
-
MMBtu
08 2.2511: Insulate bare equipment $1,134 $330 - - - $1,134
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,542 $1,170 $4,542
139,275
kWh
- - -
10 2.2414: Use waste heat from hot flue gases to preheat $9,389 $25,000 - - - $9,389
-
MMBtu
11 2.2442: Preheat combustion air with waste heat $9,389 $10,000 - - - $9,389
-
MMBtu
12 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,386 $1,600 $1,386
41,986
kWh
- - -
13 2.9114: Use solar heat to make electricty $19,610 $190,384 $8,782
266,130
kWh
$10,828
-
kW-mo/yr
- -
TOTAL RECOMMENDED $96,925 $297,370 $30,222
921,109
kWh
$25,251
-
kW-mo/yr
$20,797 $20,655
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs