ITAC Assessment: ND0242
ITAC logo
ITAC Assessment: ND0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Sewage Vacuum Pumps
NAICS
n/a
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 18,300
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,933 242,966
kWh
Electricity Fees $848 -
Natural Gas $9,490 1,857
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,391 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $892

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.8121: Apply for tax-free status for energy purchases $700 $250 - $700 - - -
02 2.4221: Install compressor air intakes in coolest locations $110 $280 $110
2,052
kWh
- - - -
03 2.6218: Turn off equipment when not in use $132 - $132
2,345
kWh
- - - -
04 2.4133: Use most efficient type of electric motors $348 $2,770 $348
6,448
kWh
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $45 $150 $45
879
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $401 $723 $401
7,327
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $93 $620 $93
1,758
kWh
- - - -
08 2.7447: Install vinyl strip / high speed / air curtain doors $432 $197 - - $432
-
MMBtu
- -
09 2.7491: Insulate glazing, walls, ceilings, and roofs $494 $262 - - $494
-
MMBtu
- -
10 2.7111: Reduce illumination to minimum necessary levels $547 $508 $547
9,379
kWh
- - - -
11 3.1175: Use a different or recycled raw material $481 $481 - - - - $481
-
lb
12 3.5221: Recycle casting sand $544 $1,552 - - - - $544
-
lb
13 3.2123: Convert to high volume low pressure (hvlp) paint guns $64 $400 - - - $64
-
gal
-
TOTAL RECOMMENDED $4,391 $8,193 $1,676
30,188
kWh
$700 $926
-
MMBtu
$64
-
gal
$1,025
-
lb
TOTAL IMPLEMENTED $892 $4,322 $348
6,448
kWh
- - - $544
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs