Assessment Year | 1993 |
---|---|
Principal Product | Plating |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 125 |
Plant Area |
80,000
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 8,592
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $225,228 | 5,840,856 |
kWh
|
$0.039 |
Natural Gas | $123,888 | 38,540 |
MMBtu
|
$3.21 |
LPG | $6,051 | 747 |
MMBtu
|
$8.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $91,475 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,697 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $57,570 | $375,000 |
$162,300
4,209,555
kWh
|
$(-87,546.0)
-
MMBtu
|
- | $(-17,184.0) | |
02 | 2.2514: Cover open tanks | $17,260 | $11,104 | - |
$17,260
-
MMBtu
|
- | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,681 | $35,000 |
$14,159
243,552
kWh
|
$(-3,478.0)
-
MMBtu
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $3,229 | $710 | - |
$3,229
-
MMBtu
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $294 | $171 |
$294
7,620
kWh
|
- | - | - | |
06 | 2.1213: Direct warmest air to combustion intake | $976 | $1,200 | - |
$976
-
MMBtu
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $757 | $221 |
$757
19,637
kWh
|
- | - | - | |
08 | 2.8223: Add air shields to trucks to increase fuel mileage | $527 | $1,000 | - | - |
$527
-
MMBtu
|
- | |
09 | 2.4314: Use synthetic lubricant | $181 | $85 |
$181
4,689
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $91,475 | $424,491 |
$177,691
4,485,053
kWh
|
$(-69,559.0)
-
MMBtu
|
$527
-
MMBtu
|
$(-17,184.0) | ||
TOTAL IMPLEMENTED | $22,697 | $13,491 |
$1,232
31,946
kWh
|
$21,465
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs