| Assessment Year | 1993 |
|---|---|
| Principal Product | Plating |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $5 M to 10M |
| # of Employees | 125 |
| Plant Area |
80,000
ft2
|
| Annual Production | 2,000,000
pieces
|
| Production Hrs. Annual | 8,592
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $225,228 | 5,840,856 |
kWh
|
$0.039 |
| Natural Gas | $123,888 | 38,540 |
MMBtu
|
$3.21 |
| LPG | $6,051 | 747 |
MMBtu
|
$8.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $91,475 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,697 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $57,570 | $375,000 |
$162,300
4,209,555
kWh
|
$(-87,546.0)
-
MMBtu
|
- | $(-17,184.0) | |
| 02 | 2.2514: Cover open tanks | $17,260 | $11,104 | - |
$17,260
-
MMBtu
|
- | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,681 | $35,000 |
$14,159
243,552
kWh
|
$(-3,478.0)
-
MMBtu
|
- | - | |
| 04 | 2.2437: Recover waste heat from equipment | $3,229 | $710 | - |
$3,229
-
MMBtu
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $294 | $171 |
$294
7,620
kWh
|
- | - | - | |
| 06 | 2.1213: Direct warmest air to combustion intake | $976 | $1,200 | - |
$976
-
MMBtu
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $757 | $221 |
$757
19,637
kWh
|
- | - | - | |
| 08 | 2.8223: Add air shields to trucks to increase fuel mileage | $527 | $1,000 | - | - |
$527
-
MMBtu
|
- | |
| 09 | 2.4314: Use synthetic lubricant | $181 | $85 |
$181
4,689
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $91,475 | $424,491 |
$177,691
4,485,053
kWh
|
$(-69,559.0)
-
MMBtu
|
$527
-
MMBtu
|
$(-17,184.0) | ||
| TOTAL IMPLEMENTED | $22,697 | $13,491 |
$1,232
31,946
kWh
|
$21,465
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs