Assessment Year | 1996 |
---|---|
Principal Product | meat and bread slicers |
NAICS |
n/a
|
SIC | 3698: |
Sales Range | $10 M to 50M |
# of Employees | 94 |
Plant Area |
100,000
ft2
|
Annual Production | 7,000
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,587 | 867,526 |
kWh
|
$0.057 |
Electricity Demand | $28,033 | 3,411 |
kW-mo/yr
|
$8.22 |
Electricity Fees | $(-1,910.0) | - |
|
- |
Natural Gas | $50,680 | 12,528 |
MMBtu
|
$4.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,651 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,851 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $431 | $488 | - | - |
$431
-
MMBtu
|
- | |
02 | 2.7494: Install storm windows and doors | $9,732 | $23,800 |
$5,293
92,614
kWh
|
- |
$4,439
-
MMBtu
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $3,310 | $775 | - | - |
$3,310
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $91 | $90 |
$91
1,465
kWh
|
- | - | - | |
05 | 2.1213: Direct warmest air to combustion intake | $178 | $800 | - | - |
$178
-
MMBtu
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $387 | $900 |
$387
5,862
kWh
|
- | - | - | |
07 | 2.7124: Make a practice of turning off lights when not needed | $4,513 | - |
$2,883
50,410
kWh
|
$1,630
-
kW-mo/yr
|
- | - | |
08 | 2.4133: Use most efficient type of electric motors | $1,019 | $970 |
$651
11,430
kWh
|
$368
-
kW-mo/yr
|
- | - | |
09 | 2.2123: Insulate feedwater tank | $609 | $528 | - | - |
$609
-
MMBtu
|
- | |
10 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $152 | $72 | - | - |
$152
-
MMBtu
|
- | |
11 | 3.4115: Recover and reuse cooling water | $1,718 | $6,000 |
$45
879
kWh
|
$25
-
kW-mo/yr
|
- |
$1,648
-
Tgal
|
|
12 | 3.4157: Replace water cooling on processes with air cooling | $3,511 | $5,900 |
$1,190
20,809
kWh
|
$673
-
kW-mo/yr
|
- |
$1,648
-
Tgal
|
|
TOTAL RECOMMENDED | $25,651 | $40,323 |
$10,540
183,469
kWh
|
$2,696
-
kW-mo/yr
|
$9,119
-
MMBtu
|
$3,296
-
Tgal
|
||
TOTAL IMPLEMENTED | $4,851 | $2,323 |
$742
12,895
kWh
|
$368
-
kW-mo/yr
|
$3,741
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs