ITAC Assessment: ND0239
ITAC logo
ITAC Assessment: ND0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plastic Plumbing Fixtures
NAICS
n/a
SIC 3088: Plastics Plumbing Fixtures
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 84,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 2,800
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,313 966,295
kWh
Electricity Demand $10,504 4,040
kW-mo/yr
Electricity Fees $4,412 -
Natural Gas $40,012 9,266
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,796

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4221: Install compressor air intakes in coolest locations $222 $300 $222
3,810
kWh
- - -
02 2.7124: Make a practice of turning off lights when not needed $1,166 - $988
16,413
kWh
$178
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $146 $200 $124
2,052
kWh
$22
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $1,041 $3,720 $885
14,654
kWh
$156
-
kW-mo/yr
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $134 $280 - - $134
-
MMBtu
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $75 $234 - - $75
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $136 $240 $115
2,052
kWh
$21
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,533 $500 $1,533
28,722
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,510 $817 $1,255
23,447
kWh
$255
-
kW-mo/yr
- -
10 3.5212: Regrind, reuse, or sell scrap plastic parts $3,777 $188 - - - $3,777
-
lb
TOTAL RECOMMENDED $9,740 $6,479 $5,122
91,150
kWh
$632
-
kW-mo/yr
$209
-
MMBtu
$3,777
-
lb
TOTAL IMPLEMENTED $2,796 $4,520 $2,640
47,186
kWh
$156
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings