ITAC Assessment: ND0231
ITAC logo
ITAC Assessment: ND0231
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product paints, resins, varnishes
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 83,000
ft2
Annual Production 1,200
Tgal
Production Hrs. Annual 8,740
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,649 1,508,793
kWh
Natural Gas $71,369 15,760
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,453 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,107

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $645 $200 $645
11,430
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,862 $295 $1,862
33,118
kWh
-
03 2.1213: Direct warmest air to combustion intake $1,653 $1,500 - $1,653
-
MMBtu
04 2.1121: Use insulation in furnaces to facilitate heating / cooling $70 $92 - $70
-
MMBtu
05 2.4133: Use most efficient type of electric motors $13,304 $11,130 $13,304
296,893
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $786 $828 $786
11,137
kWh
-
07 2.8112: Combine utility meters $3,325 $3,325 $3,325
-
kWh
-
08 2.3212: Optimize plant power factor $5,298 $3,780 $5,298
-
kWh
-
09 2.7447: Install vinyl strip / high speed / air curtain doors $276 $335 - $276
-
MMBtu
10 2.6218: Turn off equipment when not in use $614 - $614
7,620
kWh
-
11 2.2437: Recover waste heat from equipment $620 $500 - $620
-
MMBtu
TOTAL RECOMMENDED $28,453 $21,985 $25,834
360,198
kWh
$2,619
-
MMBtu
TOTAL IMPLEMENTED $18,107 $13,288 $17,211
360,198
kWh
$896
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs