Assessment Year | 1995 |
---|---|
Principal Product | fuel rails |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 550 |
Plant Area |
130,000
ft2
|
Annual Production | 6,300,000
pieces
|
Production Hrs. Annual | 6,800
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $563,308 | 9,084,115 |
kWh
|
$0.062 |
Natural Gas | $104,524 | 17,979 |
MMBtu
|
$5.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,853 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Gaseous Waste Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $5,630 | $6,024 |
$5,630
-
kWh
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $770 | $870 |
$770
12,309
kWh
|
- | - | - | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $189 | $250 | - |
$189
-
MMBtu
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $156 | $740 |
$156
2,638
kWh
|
- | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $7,286 | $3,500 |
$7,286
117,526
kWh
|
- | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,453 | $750 |
$1,453
23,447
kWh
|
- | - | - | - | |
07 | 2.6218: Turn off equipment when not in use | $368 | $1,080 |
$368
5,275
kWh
|
- | - | - | - | |
08 | 2.4133: Use most efficient type of electric motors | $8,974 | $8,710 |
$8,974
144,783
kWh
|
- | - | - | - | |
09 | 3.1191: Change procedures / equipment / operating conditions | $6,558 | $750 | - | - | - | - |
$6,558
-
lb
|
|
10 | 3.3128: Utilize other methods to remove contaminants | $4,457 | $3,000 | - | - |
$2,195
-
gal
|
$2,262
-
gal
|
- | |
11 | 3.1242: Allow drainage before withdrawing object | $12 | $15 | - | - |
$12
-
gal
|
- | - | |
TOTAL RECOMMENDED | $35,853 | $25,689 |
$24,637
305,978
kWh
|
$189
-
MMBtu
|
$2,207
-
gal
|
$2,262
-
gal
|
$6,558
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Gaseous Waste Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs