ITAC Assessment: MO0071
ITAC logo
ITAC Assessment: MO0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BUILDING PRODUCTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area
n/a
Annual Production 7,900,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,875 4,243,259
kWh
Natural Gas $2,303 515
MMBtu
LPG $2,794 321
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $1,060 $8,000 $1,060
17,292
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,904 $235 $1,904
31,067
kWh
03 2.4221: Install compressor air intakes in coolest locations $1,648 $760 $1,648
26,964
kWh
04 2.4131: Size electric motors for peak operating efficiency $149 $354 $149
2,345
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $950 $10,000 $950
15,533
kWh
TOTAL RECOMMENDED $5,711 $19,349 $5,711
93,201
kWh
TOTAL IMPLEMENTED $5,562 $18,995 $5,562
90,856
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs