ITAC Assessment: ND0223
ITAC logo
ITAC Assessment: ND0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Air Handling Units
NAICS
n/a
SIC 3567: Industrial Process Furnaces and Ovens
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 93,000
ft2
Annual Production 450
pieces
Production Hrs. Annual 3,936
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,079 898,593
kWh
Natural Gas $23,653 5,555
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $201 $400 n/a $201
2,931
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $149 $90 n/a - $149
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $778 $300 n/a $778
11,137
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $393 $890 n/a $393
5,569
kWh
-
05 2.6218: Turn off equipment when not in use $194 $800 n/a $194
2,931
kWh
-
06 2.6218: Turn off equipment when not in use $290 $390 n/a $290
4,103
kWh
-
07 2.4133: Use most efficient type of electric motors $3,040 $2,500 n/a $3,040
43,962
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $105 $42 n/a $105
1,465
kWh
-
TOTAL RECOMMENDED $5,150 $5,412 $5,001
72,098
kWh
$149
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs