Assessment Year | 1998 |
---|---|
Principal Product | Die-Cast Machines |
NAICS |
n/a
|
SIC | 3542: Machine Tools, Metal Forming Types |
Sales Range | $50 M to 100M |
# of Employees | 253 |
Plant Area |
119,952
ft2
|
Annual Production | 62
pieces
|
Production Hrs. Annual | 6,311
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $151,942 | 4,604,631 |
kWh
|
$0.033 |
Electricity Demand | $87,445 | 12,384 |
kW-mo/yr
|
$7.06 |
Electricity Fees | $9,167 | - |
|
- |
Natural Gas | $99,570 | 24,729 |
MMBtu
|
$4.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $449,086 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $246,385 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,401 | $25,843 |
$4,913
148,886
kWh
|
$2,488
-
kW-mo/yr
|
- | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $5,221 | $938 |
$5,221
158,265
kWh
|
- | - | - | - | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $20,053 | $5,250 | - | - |
$20,053
-
MMBtu
|
- | - | |
04 | 2.8113: Purchase gas directly from a contract gas supplier | $24,729 | $250 | - | - |
$24,729
-
MMBtu
|
- | - | |
05 | 2.3192: Use fossil fuel powered generator during peak demand periods | $21,553 | $80,000 |
$29,547
895,369
kWh
|
$16,944
-
kW-mo/yr
|
$(-24,938.0)
-
MMBtu
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $862 | $1,000 |
$862
26,084
kWh
|
- | - | - | - | |
07 | 2.2437: Recover waste heat from equipment | $9,603 | $2,000 | - | - |
$9,603
-
MMBtu
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,264 | $1,800 |
$2,264
68,581
kWh
|
- | - | - | - | |
09 | 3.4115: Recover and reuse cooling water | $6,202 | $4,500 | - | - | - |
$6,202
-
Tgal
|
- | |
10 | 4.711: Initiate a total quality management program | $200,000 | - | - | - | - | - | $200,000 | |
11 | 4.521: Clear and rent existing space | $151,198 | $5,000 |
$2,666
80,891
kWh
|
- |
$25,433
-
MMBtu
|
- | $123,099 | |
TOTAL RECOMMENDED | $449,086 | $126,581 |
$45,473
1,378,076
kWh
|
$19,432
-
kW-mo/yr
|
$54,880
-
MMBtu
|
$6,202
-
Tgal
|
$323,099 | ||
TOTAL IMPLEMENTED | $246,385 | $40,393 |
$8,039
243,551
kWh
|
$2,488
-
kW-mo/yr
|
$29,656
-
MMBtu
|
$6,202
-
Tgal
|
$200,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs