Assessment Year | 1994 |
---|---|
Principal Product | machined parts |
NAICS |
n/a
|
SIC | 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
49,000
ft2
|
Annual Production | 4,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $60,058 | 1,032,532 |
kWh
|
$0.058 |
Natural Gas | $4,078 | 762 |
MMBtu
|
$5.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,764 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,667 | $500 | n/a |
$8,667
148,886
kWh
|
- | - |
02 | 2.4133: Use most efficient type of electric motors | $7,724 | $11,100 | n/a |
$7,724
132,767
kWh
|
- | - |
03 | 2.8114: Change rate schedules or other changes in utility service | $3,504 | - | n/a | - | - | $3,504 |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,685 | $1,147 | n/a |
$2,685
46,307
kWh
|
- | - |
05 | 2.3212: Optimize plant power factor | $2,352 | $7,000 | n/a |
$2,352
-
kWh
|
- | - |
06 | 2.2531: Re-size charging openings or add movable cover or door | $1,035 | $500 | n/a |
$274
4,689
kWh
|
$761
-
MMBtu
|
- |
07 | 2.4221: Install compressor air intakes in coolest locations | $733 | $900 | n/a |
$733
12,603
kWh
|
- | - |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $553 | $117 | n/a |
$553
9,672
kWh
|
- | - |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $252 | $380 | n/a | - |
$252
-
MMBtu
|
- |
10 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $181 | $600 | n/a |
$181
879
kWh
|
- | - |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $78 | $200 | n/a |
$78
1,465
kWh
|
- | - |
TOTAL RECOMMENDED | $27,764 | $22,444 |
$23,247
357,268
kWh
|
$1,013
-
MMBtu
|
$3,504 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs