ITAC Assessment: SF0345
ITAC logo
ITAC Assessment: SF0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Profile and Sheet Extrusions
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 36,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,928 2,525,760
kWh
Electricity Demand $54,613 6,446
kW-mo/yr
Electricity Fees $4,274 -
Natural Gas $8,418 585
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,064 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,453

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6231: Utilize controls to operate equipment only when needed $3,945 $711 $3,945
55,230
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,951 $2,939 $7,289
102,039
kWh
$1,662
-
kW-mo/yr
03 2.4239: Eliminate or reduce compressed air usage $9,919 $5,140 $8,077
113,071
kWh
$1,842
-
kW-mo/yr
04 2.6231: Utilize controls to operate equipment only when needed $1,019 $711 $1,019
14,270
kWh
-
05 2.6231: Utilize controls to operate equipment only when needed $4,266 $4,307 $3,432
48,043
kWh
$834
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,999 $3,759 $2,426
33,958
kWh
$573
-
kW-mo/yr
07 2.7135: Install occupancy sensors $511 $1,404 $437
6,118
kWh
$74
-
kW-mo/yr
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,115 $6,510 $1,722
24,111
kWh
$393
-
kW-mo/yr
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,339 $4,380 $1,090
15,260
kWh
$249
-
kW-mo/yr
TOTAL RECOMMENDED $35,064 $29,861 $29,437
412,100
kWh
$5,627
-
kW-mo/yr
TOTAL IMPLEMENTED $6,453 $14,649 $5,238
73,329
kWh
$1,215
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings