ITAC Assessment: ND0205
ITAC logo
ITAC Assessment: ND0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Packaging Honeycomb Paper
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 86,000
ft2
Annual Production 9
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,421 1,344,666
kWh
Natural Gas $32,722 8,149
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,593 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,046

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $9,139 $1,000 $9,139
155,627
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $517 $200 - $517
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,972 $3,020 $1,972
33,411
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $418 $500 - $418
-
MMBtu
05 2.7243: Improve air circulation with destratification fans / other methods $189 $504 $(-277.0)
(-4,689)
kWh
$466
-
MMBtu
06 2.7447: Install vinyl strip / high speed / air curtain doors $342 - - $342
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $312 $630 $312
5,275
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $295 $400 $295
4,982
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $212 $640 $212
3,517
kWh
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $197 $260 $197
3,224
kWh
-
TOTAL RECOMMENDED $13,593 $7,154 $11,850
201,347
kWh
$1,743
-
MMBtu
TOTAL IMPLEMENTED $12,046 $4,720 $11,111
189,038
kWh
$935
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs