Assessment Year | 1994 |
---|---|
Principal Product | Progressive Dies |
NAICS |
n/a
|
SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
Sales Range | $5 M to 10M |
# of Employees | 66 |
Plant Area |
77,000
ft2
|
Annual Production | 60
pieces
|
Production Hrs. Annual | 5,151
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $79,091 | 1,423,798 |
kWh
|
$0.056 |
Natural Gas | $11,608 | 2,019 |
MMBtu
|
$5.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,977 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,457 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $7,378 | $1,000 |
$7,378
103,165
kWh
|
|
02 | 2.7111: Reduce illumination to minimum necessary levels | $3,596 | $200 |
$3,596
49,531
kWh
|
|
03 | 2.4133: Use most efficient type of electric motors | $2,553 | $3,020 |
$2,553
37,222
kWh
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $601 | $500 |
$601
9,965
kWh
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $495 | $504 |
$495
9,379
kWh
|
|
06 | 2.7124: Make a practice of turning off lights when not needed | $361 | - |
$361
7,034
kWh
|
|
07 | 2.6231: Utilize controls to operate equipment only when needed | $308 | $630 |
$308
5,569
kWh
|
|
08 | 2.4221: Install compressor air intakes in coolest locations | $275 | $400 |
$275
4,396
kWh
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $232 | $640 |
$232
4,103
kWh
|
|
10 | 2.6231: Utilize controls to operate equipment only when needed | $178 | $260 |
$178
3,517
kWh
|
|
TOTAL RECOMMENDED | $15,977 | $7,154 |
$15,977
233,881
kWh
|
||
TOTAL IMPLEMENTED | $1,457 | $1,004 |
$1,457
26,378
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |