Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Clamps, Brackets and Quarterfenders
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 65,000
ft2
Annual Production 24,000,000
pieces
Production Hrs. Annual 4,350
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,925 324,443
kWh
Natural Gas $4,119 720
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,837

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,500 $3,780 $2,500
25,791
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $447 $712 - $447
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,208 $280 $2,208
22,860
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $220 $323 - $220
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,129 $293 $1,129
11,723
kWh
-
06 2.7135: Install occupancy sensors $683 $400 $683
7,034
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $234 $375 $234
2,345
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $183 $210 $183
2,052
kWh
-
09 2.7124: Make a practice of turning off lights when not needed $92 - $92
879
kWh
-
TOTAL RECOMMENDED $7,696 $6,373 $7,029
72,684
kWh
$667
-
MMBtu
TOTAL IMPLEMENTED $5,837 $4,353 $5,837
60,374
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs