Assessment Year | 1993 |
---|---|
Principal Product | Aluminum and fiberglass truck caps |
NAICS |
n/a
|
SIC | 3713: Truck and Bus Bodies |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
160,000
ft2
|
Annual Production | 46,000
pieces
|
Production Hrs. Annual | 8,670
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $126,375 | 2,087,632 |
kWh
|
$0.061 |
Natural Gas | $116,976 | 24,947 |
MMBtu
|
$4.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,882 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,245 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $6,873 | $500 | - | - | $6,873 | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,341 | $200 |
$1,341
23,154
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,100 | $2,000 |
$5,100
86,166
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,550 | $730 |
$1,550
26,084
kWh
|
- | - | |
05 | 2.3212: Optimize plant power factor | $5,381 | $3,268 |
$5,381
-
kWh
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $198 | $2,600 |
$198
3,517
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $270 | $320 |
$270
4,396
kWh
|
- | - | |
08 | 2.2511: Insulate bare equipment | $488 | $816 | - |
$488
-
MMBtu
|
- | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $430 | $820 | - |
$430
-
MMBtu
|
- | |
10 | 2.8114: Change rate schedules or other changes in utility service | $2,251 | $11,840 |
$2,251
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $23,882 | $23,094 |
$16,091
143,317
kWh
|
$918
-
MMBtu
|
$6,873 | ||
TOTAL IMPLEMENTED | $20,245 | $6,698 |
$13,372
135,404
kWh
|
- | $6,873 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs