Assessment Year | 1993 |
---|---|
Principal Product | basement supports, porch swings |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
45,000
ft2
|
Annual Production | 191,240
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $18,377 | 243,259 |
kWh
|
$0.076 |
Natural Gas | $20,660 | 4,563 |
MMBtu
|
$4.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,403 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,770 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $286 | $708 |
$286
3,810
kWh
|
- | |
02 | 2.7442: Keep doors and windows shut when not on use | $1,135 | $657 | - |
$1,135
-
MMBtu
|
|
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $996 | $567 | - |
$996
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $330 | $354 |
$330
4,396
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $289 | $360 |
$289
3,810
kWh
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $257 | $900 | - |
$257
-
MMBtu
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $89 | $225 |
$89
1,172
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21 | $20 |
$21
293
kWh
|
- | |
TOTAL RECOMMENDED | $3,403 | $3,791 |
$1,015
13,481
kWh
|
$2,388
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,770 | $2,142 |
$378
4,982
kWh
|
$1,392
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs