ITAC Assessment: ND0164
ITAC logo
ITAC Assessment: ND0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product basement supports, porch swings
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 45,000
ft2
Annual Production 191,240
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,377 243,259
kWh
Natural Gas $20,660 4,563
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,403 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $286 $708 $286
3,810
kWh
-
02 2.7442: Keep doors and windows shut when not on use $1,135 $657 - $1,135
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $996 $567 - $996
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $330 $354 $330
4,396
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $289 $360 $289
3,810
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $257 $900 - $257
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $89 $225 $89
1,172
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $21 $20 $21
293
kWh
-
TOTAL RECOMMENDED $3,403 $3,791 $1,015
13,481
kWh
$2,388
-
MMBtu
TOTAL IMPLEMENTED $1,770 $2,142 $378
4,982
kWh
$1,392
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs