ITAC Assessment: ND0155
ITAC logo
ITAC Assessment: ND0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Mushrooms
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 305,000
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 3,822
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $446,757 8,068,289
kWh
Fuel Oil #6 $475,958 171,016
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $140,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,666

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.2121: Increase amount of condensate returned $105,938 $35,500 - $105,938
-
MMBtu
02 2.4133: Use most efficient type of electric motors $6,600 $4,745 $6,600
119,285
kWh
-
03 2.7492: Use proper thickness of insulation on building envelope $13,500 $33,750 - $13,500
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $7,317 $8,000 - $7,317
-
MMBtu
05 2.1231: Establish burner maintenance schedule for boilers $3,842 $40 - $3,842
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,724 $3,258 $2,724
49,238
kWh
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $332 $890 - $332
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $109 $200 $109
2,052
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $15 $40 $15
293
kWh
-
TOTAL RECOMMENDED $140,377 $86,423 $9,448
170,868
kWh
$130,929
-
MMBtu
TOTAL IMPLEMENTED $26,666 $41,793 $9,324
168,523
kWh
$17,342
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs