| Assessment Year | 1993 |
|---|---|
| Principal Product | Mushrooms |
| NAICS |
n/a
|
| SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
305,000
ft2
|
| Annual Production | 14,000,000
lb
|
| Production Hrs. Annual | 3,822
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $446,757 | 8,068,289 |
kWh
|
$0.055 |
| Fuel Oil #6 | $475,958 | 171,016 |
MMBtu
|
$2.78 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $140,377 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $26,666 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2121: Increase amount of condensate returned | $105,938 | $35,500 | - |
$105,938
-
MMBtu
|
|
| 02 | 2.4133: Use most efficient type of electric motors | $6,600 | $4,745 |
$6,600
119,285
kWh
|
- | |
| 03 | 2.7492: Use proper thickness of insulation on building envelope | $13,500 | $33,750 | - |
$13,500
-
MMBtu
|
|
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $7,317 | $8,000 | - |
$7,317
-
MMBtu
|
|
| 05 | 2.1231: Establish burner maintenance schedule for boilers | $3,842 | $40 | - |
$3,842
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,724 | $3,258 |
$2,724
49,238
kWh
|
- | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $332 | $890 | - |
$332
-
MMBtu
|
|
| 08 | 2.4221: Install compressor air intakes in coolest locations | $109 | $200 |
$109
2,052
kWh
|
- | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15 | $40 |
$15
293
kWh
|
- | |
| TOTAL RECOMMENDED | $140,377 | $86,423 |
$9,448
170,868
kWh
|
$130,929
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $26,666 | $41,793 |
$9,324
168,523
kWh
|
$17,342
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs