Assessment Year | 2002 |
---|---|
Principal Product | Mouse Pads |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
52,000
ft2
|
Annual Production | 17,500,000
pieces
|
Production Hrs. Annual | 4,352
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $92,072 | 1,147,903 |
kWh
|
$0.080 |
Electricity Demand | $9,120 | 4,226 |
kW-mo/yr
|
$2.16 |
Electricity Fees | $7,756 | - |
|
- |
Natural Gas | $8,069 | 1,059 |
MMBtu
|
$7.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $155,503 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $86,202 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $463 | $1,250 |
$463
6,139
kWh
|
- | - | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $1,845 | $273 |
$1,682
22,303
kWh
|
$43
-
kW-mo/yr
|
- | - | $120 | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $370 | - |
$370
4,909
kWh
|
- | - | - | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $418 | $30 |
$411
5,445
kWh
|
$7
-
kW-mo/yr
|
- | - | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $4,343 | $14,000 |
$4,269
55,601
kWh
|
$74
-
kW-mo/yr
|
- | - | - | |
06 | 3.5217: Reuse / recycle/ sell paper products | $9,360 | $40 | - | - | - | $9,360 | - | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $62,280 | $2,200 | - | - | $62,280 | - | - | |
08 | 4.514: Re-arrange equipment layout to reduce handling costs | $72,604 | $3,840 | - | - | $72,604 | - | - | |
09 | 4.431: Train operators for maximum operating efficiency | $3,820 | $2,080 | - | - | $3,820 | - | - | |
TOTAL RECOMMENDED | $155,503 | $23,713 |
$7,195
94,397
kWh
|
$124
-
kW-mo/yr
|
$138,704 | $9,360 | $120 | ||
TOTAL IMPLEMENTED | $86,202 | $5,990 |
$411
5,445
kWh
|
$7
-
kW-mo/yr
|
$76,424 | $9,360 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs