Assessment Year | 1988 |
---|---|
Principal Product | SPRINGS, STAMPINGS,WIRE |
NAICS |
n/a
|
SIC | 3495: Wire Springs |
Sales Range | $5 M to 10M |
# of Employees | 43 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,375
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $47,488 | 681,125 |
kWh
|
$0.070 |
Natural Gas | $11,297 | 2,304 |
MMBtu
|
$4.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,426 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,826 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4312: Improve lubrication practices | $1,042 | - |
$1,042
14,947
kWh
|
|
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $470 | - |
$470
6,741
kWh
|
|
03 | 2.3132: Recharge batteries on during off-peak demand periods | $1,213 | - |
$1,213
-
kWh
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $558 | $1,000 |
$558
7,913
kWh
|
|
05 | 2.6121: Reduce hot water temperature to the minimum required | $143 | - |
$143
2,052
kWh
|
|
TOTAL RECOMMENDED | $3,426 | $1,000 |
$3,426
31,653
kWh
|
||
TOTAL IMPLEMENTED | $1,826 | - |
$1,826
8,793
kWh
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs