ITAC Assessment: WI0025
ITAC logo
ITAC Assessment: WI0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product SPRINGS, STAMPINGS,WIRE
NAICS
n/a
SIC 3495: Wire Springs
Sales Range $5
M
to 10
M
# of Employees 43
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,375
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,488 681,125
kWh
Natural Gas $11,297 2,304
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,826

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4312: Improve lubrication practices $1,042 - $1,042
14,947
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $470 - $470
6,741
kWh
03 2.3132: Recharge batteries on during off-peak demand periods $1,213 - $1,213
-
kWh
04 2.4221: Install compressor air intakes in coolest locations $558 $1,000 $558
7,913
kWh
05 2.6121: Reduce hot water temperature to the minimum required $143 - $143
2,052
kWh
TOTAL RECOMMENDED $3,426 $1,000 $3,426
31,653
kWh
TOTAL IMPLEMENTED $1,826 - $1,826
8,793
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs