| Assessment Year | 1993 |
|---|---|
| Principal Product | Restaurant Food |
| NAICS |
n/a
|
| SIC | 2599: Furniture and Fixtures, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 100 |
| Plant Area |
130,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $50,743 | 682,591 |
kWh
|
$0.074 |
| Natural Gas | $23,927 | 5,520 |
MMBtu
|
$4.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,982 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $850 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $341 | $2,000 |
$341
4,689
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,901 | $1,982 |
$1,901
25,498
kWh
|
- | |
| 03 | 2.7135: Install occupancy sensors | $1,154 | $800 |
$1,154
15,533
kWh
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $850 | $590 |
$850
11,430
kWh
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $479 | $400 |
$479
6,448
kWh
|
- | |
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,103 | $918 | - |
$1,103
-
MMBtu
|
|
| 07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $304 | $1,085 |
$304
4,103
kWh
|
- | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $850 | $360 |
$850
11,430
kWh
|
- | |
| TOTAL RECOMMENDED | $6,982 | $8,135 |
$5,879
79,131
kWh
|
$1,103
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $850 | $360 |
$850
11,430
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs