Assessment Year 1993
Principal Product Brakes, spindles, and hubs
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 359
Plant Area 159,248
ft2
Annual Production 86,189,238
lb
Production Hrs. Annual 6,450
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $316,460 5,087,046
kWh
Natural Gas $139,111 31,287
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,933 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7441: Replace broken windows and/or window sash $613 $188 - $613
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $2,776 $1,350 $2,776
44,549
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,499 $1,132 $7,499
120,750
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $291 $698 - $291
-
MMBtu
05 2.4133: Use most efficient type of electric motors $5,600 $3,713 $5,600
89,977
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $154 $180 $154
2,345
kWh
-
TOTAL RECOMMENDED $16,933 $7,261 $16,029
257,621
kWh
$904
-
MMBtu
TOTAL IMPLEMENTED $16,933 $7,261 $16,029
257,621
kWh
$904
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs