Assessment Year | 1992 |
---|---|
Principal Product | MOLD REFURBISHING |
NAICS |
n/a
|
SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
Sales Range | $5 M to 10M |
# of Employees | 56 |
Plant Area |
n/a
|
Annual Production | 300
pieces
|
Production Hrs. Annual | 4,940
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,692 | 1,679,367 |
kWh
|
$0.050 |
Natural Gas | $40,652 | 9,559 |
MMBtu
|
$4.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,892 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $4,301 | $2,421 |
$4,301
-
kWh
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $438 | $3,450 |
$438
9,672
kWh
|
- | - | |
03 | 2.6232: Install set-back timers | $2,057 | - |
$2,057
27,550
kWh
|
- | - | |
04 | 2.1213: Direct warmest air to combustion intake | $1,038 | $300 | - |
$1,038
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $444 | $740 |
$618
13,482
kWh
|
- | $(-174.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $158 | $500 |
$252
3,224
kWh
|
- | $(-94.0) | |
07 | 2.4221: Install compressor air intakes in coolest locations | $456 | $500 |
$456
9,965
kWh
|
- | - | |
TOTAL RECOMMENDED | $8,892 | $7,911 |
$8,122
63,893
kWh
|
$1,038
-
MMBtu
|
$(-268.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs