| Assessment Year | 1992 |
|---|---|
| Principal Product | CUSTOM TESTING MACHINERY |
| NAICS |
n/a
|
| SIC | 3829: Measuring and Controlling Devices, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
n/a
|
| Annual Production | 1,000,000
lb
|
| Production Hrs. Annual | 5,460
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $54,874 | 921,454 |
kWh
|
$0.060 |
| Natural Gas | $20,797 | 4,326 |
MMBtu
|
$4.81 |
| Other Energy | $290 | 4 |
MMBtu
|
$72.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,759 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,512 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $2,695 | $4,000 |
$2,695
45,135
kWh
|
- | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $237 | $4,770 |
$237
4,103
kWh
|
- | - | - | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $1,344 | $1,200 |
$1,344
22,567
kWh
|
- | - | - | |
| 04 | 2.7494: Install storm windows and doors | $996 | $750 | - |
$996
-
MMBtu
|
- | - | |
| 05 | 2.6232: Install set-back timers | $656 | $354 |
$656
11,137
kWh
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $204 | $692 |
$378
6,448
kWh
|
- | - | $(-174.0) | |
| 07 | 2.1332: Convert combustion equipment to burn natural gas | $273 | $450 | - |
$(-17.0)
-
MMBtu
|
$290
-
MMBtu
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $244 | $300 |
$244
4,103
kWh
|
- | - | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $110 | $200 |
$110
1,758
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $6,759 | $12,716 |
$5,664
95,251
kWh
|
$979
-
MMBtu
|
$290
-
MMBtu
|
$(-174.0) | ||
| TOTAL IMPLEMENTED | $5,512 | $7,092 |
$4,417
74,150
kWh
|
$979
-
MMBtu
|
$290
-
MMBtu
|
$(-174.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs