ITAC Assessment: KG0006
ITAC logo
ITAC Assessment: KG0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Frozen shrimp,Pack fish.
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 50,960
ft2
Annual Production 12,600,000
lb
Production Hrs. Annual 3,936
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $345,569 6,022,274
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,828 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,567

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $66,725 $1,260 $66,725
-
kWh
02 2.4133: Use most efficient type of electric motors $4,688 $9,480 $4,688
92,907
kWh
03 2.7261: Install timers and/or thermostats $3,500 $1,350 $3,500
123,095
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,449 $730 $2,449
39,566
kWh
05 2.2511: Insulate bare equipment $1,458 $270 $1,458
31,067
kWh
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,036 $3,700 $1,036
36,342
kWh
07 2.2511: Insulate bare equipment $972 $188 $972
20,809
kWh
TOTAL RECOMMENDED $80,828 $16,978 $80,828
343,786
kWh
TOTAL IMPLEMENTED $9,567 $10,668 $9,567
184,349
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs