ITAC Assessment: ND0038
ITAC logo
ITAC Assessment: ND0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product LAMINATED WOOD SHELVING
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 11,000
thousand feet
Production Hrs. Annual 5,375
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,245 3,223,036
kWh
Natural Gas $42,112 11,591
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,708 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,426

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7314: Reduce ventilation air $15,099 $7,200 - $15,099
-
MMBtu
-
02 2.3212: Optimize plant power factor $7,544 $20,000 $7,544
-
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,817 $857 $4,045
85,580
kWh
- $(-228.0)
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,882 $500 $1,882
39,859
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $1,246 $500 $1,246
26,377
kWh
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $82 $175 - $82
-
MMBtu
-
07 2.7111: Reduce illumination to minimum necessary levels $38 $90 $38
879
kWh
- -
TOTAL RECOMMENDED $29,708 $29,322 $14,755
152,695
kWh
$15,181
-
MMBtu
$(-228.0)
TOTAL IMPLEMENTED $9,426 $20,500 $9,426
39,859
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs