| Assessment Year | 1992 |
|---|---|
| Principal Product | LAMINATED WOOD SHELVING |
| NAICS |
n/a
|
| SIC | 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 11,000
thousand feet
|
| Production Hrs. Annual | 5,375
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $152,245 | 3,223,036 |
kWh
|
$0.047 |
| Natural Gas | $42,112 | 11,591 |
MMBtu
|
$3.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,708 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,426 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7314: Reduce ventilation air | $15,099 | $7,200 | - |
$15,099
-
MMBtu
|
- | |
| 02 | 2.3212: Optimize plant power factor | $7,544 | $20,000 |
$7,544
-
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,817 | $857 |
$4,045
85,580
kWh
|
- | $(-228.0) | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,882 | $500 |
$1,882
39,859
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,246 | $500 |
$1,246
26,377
kWh
|
- | - | |
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $82 | $175 | - |
$82
-
MMBtu
|
- | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $38 | $90 |
$38
879
kWh
|
- | - | |
| TOTAL RECOMMENDED | $29,708 | $29,322 |
$14,755
152,695
kWh
|
$15,181
-
MMBtu
|
$(-228.0) | ||
| TOTAL IMPLEMENTED | $9,426 | $20,500 |
$9,426
39,859
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs