Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product METAL CANS
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 275,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $557,726 10,895,369
kWh
Natural Gas $570,835 104,258
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,509 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,209

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2212: Use minimum safe oven ventilation $64,300 $2,000 - $64,300
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $1,350 $1,000 $1,350
26,084
kWh
-
03 2.2511: Insulate bare equipment $1,120 $1,200 - $1,120
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,830 $7,920 $6,830
133,353
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,700 $18,700 $9,700
189,332
kWh
-
06 2.4133: Use most efficient type of electric motors $1,209 $3,516 $1,209
23,740
kWh
-
TOTAL RECOMMENDED $84,509 $34,336 $19,089
372,509
kWh
$65,420
-
MMBtu
TOTAL IMPLEMENTED $20,209 $32,336 $19,089
372,509
kWh
$1,120
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs