Assessment Year | 1982 |
---|---|
Principal Product | HEAT EXCHANGERS |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $5 M to 10M |
# of Employees | 125 |
Plant Area |
n/a
|
Annual Production | 7,800,000
lb
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $48,904 | 885,991 |
kWh
|
$0.055 |
Natural Gas | $7,511 | 2,907 |
MMBtu
|
$2.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,356 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,321 | $24,185 |
$8,321
286,928
kWh
|
- | |
02 | 2.4322: Use or replace with energy efficient substitutes | $4,332 | $15,000 |
$4,332
-
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,256 | $13,760 |
$4,256
92,614
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,141 | $6,006 |
$2,141
73,857
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $156 | $78 |
$156
2,638
kWh
|
- | |
06 | 2.7261: Install timers and/or thermostats | $150 | $75 | - |
$150
-
MMBtu
|
|
TOTAL RECOMMENDED | $19,356 | $59,104 |
$19,206
456,037
kWh
|
$150
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs