ITAC Assessment: OK0022
ITAC logo
ITAC Assessment: OK0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product HEAT EXCHANGERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 125
Plant Area
n/a
Annual Production 7,800,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,904 885,991
kWh
Natural Gas $7,511 2,907
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,321 $24,185 $8,321
286,928
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $4,332 $15,000 $4,332
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,256 $13,760 $4,256
92,614
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,141 $6,006 $2,141
73,857
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $156 $78 $156
2,638
kWh
-
06 2.7261: Install timers and/or thermostats $150 $75 - $150
-
MMBtu
TOTAL RECOMMENDED $19,356 $59,104 $19,206
456,037
kWh
$150
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs