Assessment Year | 2018 |
---|---|
Principal Product | Injection molded plastics |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 75 |
Plant Area |
80,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $159,209 | 3,653,062 |
kWh
|
$0.044 |
Electricity Demand | $84,314 | 9,201 |
kW-mo/yr
|
$9.16 |
Natural Gas | $282 | 1 |
MMBtu
|
$282.00 |
TOTAL YEARLY COSTS | $243,805 | |||
RECOMMENDED SAVINGS* | $45,855 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,716 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,150 | $25,474 |
$9,053
207,636
kWh
|
$4,097
-
kW-mo/yr
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $250 | $250 |
$250
5,740
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,044 | $165 |
$853
19,553
kWh
|
$356
-
kW-mo/yr
|
- | $(-90.0) | $(-75.0) | |
04 | 2.4239: Eliminate or reduce compressed air usage | $197 | $900 |
$197
4,515
kWh
|
- | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $206 | $50 |
$145
3,330
kWh
|
$61
-
kW-mo/yr
|
- | - | - | |
06 | 2.4224: Upgrade controls on compressors | $1,380 | $4,000 |
$976
22,380
kWh
|
$404
-
kW-mo/yr
|
- | - | - | |
07 | 2.4154: Avoid rewinding motors more than twice | $5,240 | $12,129 |
$3,696
84,762
kWh
|
$1,544
-
kW-mo/yr
|
- | - | - | |
08 | 2.4131: Size electric motors for peak operating efficiency | $6,491 | $3,500 |
$4,578
105,000
kWh
|
$1,913
-
kW-mo/yr
|
- | - | - | |
09 | 2.8114: Change rate schedules or other changes in utility service | $17,615 | $500 |
$17,615
-
kWh
|
- | - | - | - | |
10 | 2.8114: Change rate schedules or other changes in utility service | $282 | $50 | - | - |
$282
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $45,855 | $47,018 |
$37,363
452,916
kWh
|
$8,375
-
kW-mo/yr
|
$282
-
MMBtu
|
$(-90.0) | $(-75.0) | ||
TOTAL IMPLEMENTED | $19,716 | $37,818 |
$13,602
311,951
kWh
|
$5,997
-
kW-mo/yr
|
$282
-
MMBtu
|
$(-90.0) | $(-75.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs