Assessment Year | 2016 |
---|---|
Principal Product | Aluminum extrusions |
NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
195,000
ft2
|
Annual Production | 30,000,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $631,150 | 8,188,064 |
kWh
|
$0.077 |
Natural Gas | $116,596 | 39,716 |
MMBtu
|
$2.94 |
TOTAL YEARLY COSTS | $747,746 | |||
RECOMMENDED SAVINGS* | $42,259 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,065 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,828 | $21,764 |
$10,418
135,289
kWh
|
- | $1,410 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,293 | $35,726 |
$7,782
101,070
kWh
|
- | $1,511 | |
03 | 2.7134: Use photocell controls | $2,850 | $150 |
$2,850
37,011
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,443 | $12,240 |
$2,169
28,172
kWh
|
- | $274 | |
05 | 2.7135: Install occupancy sensors | $307 | $571 |
$307
3,986
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $944 | $200 |
$1,294
16,800
kWh
|
$(-150.0) | $(-200.0) | |
07 | 2.4226: Use / purchase optimum sized compressor | $11,387 | $100 |
$11,387
147,887
kWh
|
- | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $117 | $180 |
$117
1,522
kWh
|
- | - | |
09 | 2.4151: Develop a repair/replace policy | $2,418 | $5,865 |
$2,418
31,406
kWh
|
- | - | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $672 | $103 |
$672
8,718
kWh
|
- | - | |
TOTAL RECOMMENDED | $42,259 | $76,899 |
$39,414
511,861
kWh
|
$(-150.0) | $2,995 | ||
TOTAL IMPLEMENTED | $22,065 | $57,690 |
$19,494
253,159
kWh
|
$(-150.0) | $2,721 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs