Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area 450,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,652 1,271,845
kWh
Electricity Demand $51,381 4,173
kW-mo/yr
Coal $31,330 6,266
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,703 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,096

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Coal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $30,643 $25,887 $11,781
195,146
kWh
$14,549
-
kW-mo/yr
- - - $4,313
02 2.7135: Install occupancy sensors $1,207 $944 $1,207
20,462
kWh
- - - - -
03 2.7111: Reduce illumination to minimum necessary levels $823 $182 $342
5,800
kWh
$391
-
kW-mo/yr
- - - $90
04 2.7142: Utilize higher efficiency lamps and/or ballasts $191 $48 $78
1,281
kWh
$23
-
kW-mo/yr
- - - $90
05 2.7134: Use photocell controls $4,235 $600 $1,196
19,640
kWh
$3,039
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $692 $503 $319
5,400
kWh
$363
-
kW-mo/yr
- - $10 -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $325 $100 $213
3,492
kWh
$272
-
kW-mo/yr
- $(-100.0) - $(-60.0)
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,094 $1,000 $481
7,880
kWh
$613
-
kW-mo/yr
- - - -
09 2.4226: Use / purchase optimum sized compressor $2,071 $4,500 $64
1,084
kWh
$2,007
-
kW-mo/yr
- - - -
10 2.4239: Eliminate or reduce compressed air usage $33 $150 $33
546
kWh
- - - - -
11 2.2135: Repair and eliminate steam leaks $311 $200 - - $311
-
MMBtu
- - -
12 2.4151: Develop a repair/replace policy $1,078 $3,411 $503
8,532
kWh
$575
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $42,703 $37,525 $16,217
269,263
kWh
$21,832
-
kW-mo/yr
$311
-
MMBtu
$(-100.0) $10 $4,433
TOTAL IMPLEMENTED $34,096 $30,481 $13,269
220,197
kWh
$16,173
-
kW-mo/yr
$311
-
MMBtu
$(-100.0) $10 $4,433
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Coal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs