ITAC Assessment: NC0443
ITAC logo
ITAC Assessment: NC0443
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 105,000
ft2
Annual Production 81,000,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $440,570 7,606,723
kWh
Electricity Demand $137,210 15,572
kW-mo/yr
Natural Gas $466,078 39,932
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,878 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $24,834 $105,200 $864
14,920
kWh
- $23,970
-
MMBtu
- - -
02 2.1243: Use heat from boiler blowdown to preheat boiler feed water $9,610 $27,000 - - $9,610
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,514 $500 $2,841
49,056
kWh
$513
-
kW-mo/yr
- - $(-600.0) $(-240.0)
04 2.2614: Use cooling tower or economizer to replace chiller cooling $3,960 $10,175 $3,569
61,626
kWh
$962
-
kW-mo/yr
- $(-571.0)
-
Tgal
- -
05 2.4221: Install compressor air intakes in coolest locations $633 $2,440 $498
8,606
kWh
$135
-
kW-mo/yr
- - - -
06 2.3113: Make ice during off peak hours for cooling $28,327 $96,000 - $28,327
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $69,878 $241,315 $7,772
134,208
kWh
$29,937
-
kW-mo/yr
$33,580
-
MMBtu
$(-571.0)
-
Tgal
$(-600.0) $(-240.0)
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings