| Assessment Year | 2012 |
|---|---|
| Principal Product | Pharmaceuticals |
| NAICS | 325412: Pharmaceutical Preparation Manufacturing |
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $10 M to 50M |
| # of Employees | 87 |
| Plant Area |
105,000
ft2
|
| Annual Production | 81,000,000
pieces
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $440,570 | 7,606,723 |
kWh
|
$0.058 |
| Electricity Demand | $137,210 | 15,572 |
kW-mo/yr
|
$8.81 |
| Natural Gas | $466,078 | 39,932 |
MMBtu
|
$11.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $69,878 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $24,834 | $105,200 |
$864
14,920
kWh
|
- |
$23,970
-
MMBtu
|
- | - | - | |
| 02 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $9,610 | $27,000 | - | - |
$9,610
-
MMBtu
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,514 | $500 |
$2,841
49,056
kWh
|
$513
-
kW-mo/yr
|
- | - | $(-600.0) | $(-240.0) | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,960 | $10,175 |
$3,569
61,626
kWh
|
$962
-
kW-mo/yr
|
- |
$(-571.0)
-
Tgal
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $633 | $2,440 |
$498
8,606
kWh
|
$135
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.3113: Make ice during off peak hours for cooling | $28,327 | $96,000 | - |
$28,327
-
kW-mo/yr
|
- | - | - | - | |
| TOTAL RECOMMENDED | $69,878 | $241,315 |
$7,772
134,208
kWh
|
$29,937
-
kW-mo/yr
|
$33,580
-
MMBtu
|
$(-571.0)
-
Tgal
|
$(-600.0) | $(-240.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs