Assessment Year | 2012 |
---|---|
Principal Product | Pharmaceuticals |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 87 |
Plant Area |
105,000
ft2
|
Annual Production | 81,000,000
pieces
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $440,570 | 7,606,723 |
kWh
|
$0.058 |
Electricity Demand | $137,210 | 15,572 |
kW-mo/yr
|
$8.81 |
Natural Gas | $466,078 | 39,932 |
MMBtu
|
$11.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $69,878 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $24,834 | $105,200 |
$864
14,920
kWh
|
- |
$23,970
-
MMBtu
|
- | - | - | |
02 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $9,610 | $27,000 | - | - |
$9,610
-
MMBtu
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,514 | $500 |
$2,841
49,056
kWh
|
$513
-
kW-mo/yr
|
- | - | $(-600.0) | $(-240.0) | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,960 | $10,175 |
$3,569
61,626
kWh
|
$962
-
kW-mo/yr
|
- |
$(-571.0)
-
Tgal
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $633 | $2,440 |
$498
8,606
kWh
|
$135
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.3113: Make ice during off peak hours for cooling | $28,327 | $96,000 | - |
$28,327
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $69,878 | $241,315 |
$7,772
134,208
kWh
|
$29,937
-
kW-mo/yr
|
$33,580
-
MMBtu
|
$(-571.0)
-
Tgal
|
$(-600.0) | $(-240.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs