Assessment Year | 2018 |
---|---|
Principal Product | Vehicle parts |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 243 |
Plant Area |
220,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $761,564 | 11,531,374 |
kWh
|
$0.066 | |
Electricity Demand | $347,939 | 23,145 |
kW-mo/yr
|
$15.03 | |
Natural Gas | $443,080 | 116,752 |
MMBtu
|
$3.80 | |
Waste Disposal Costs | |||||
Water Usage | $808 | 147 |
Tgal
|
$5.50 | |
TOTAL YEARLY COSTS | $1,553,391 | ||||
RECOMMENDED SAVINGS* | $333,491 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $32,416 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.112: Replace old machine with new automatic multi-station tool | $284,971 | $600,000 |
$8,225
124,623
kWh
|
$2,570
-
kW-mo/yr
|
- | - | $274,176 | |
02 | 2.2437: Recover waste heat from equipment | $16,104 | $80,009 |
$7,777
117,831
kWh
|
$8,327
-
kW-mo/yr
|
- | - | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $11,359 | $2,000 | - | - |
$12,031
-
MMBtu
|
- | $(-672.0) | |
04 | 2.3132: Recharge batteries on during off-peak demand periods | $10,822 | - | - |
$10,822
-
kW-mo/yr
|
- | - | - | |
05 | 2.4151: Develop a repair/replace policy | $6,713 | $703 |
$5,284
80,055
kWh
|
$1,653
-
kW-mo/yr
|
- | - | $(-224.0) | |
06 | 2.2511: Insulate bare equipment | $2,979 | $1,328 | - | - |
$2,979
-
MMBtu
|
- | - | |
07 | 3.4151: Minimize water usage | $543 | $2,100 | - | - | - |
$808
-
Tgal
|
$(-265.0) | |
TOTAL RECOMMENDED | $333,491 | $686,140 |
$21,286
322,509
kWh
|
$23,372
-
kW-mo/yr
|
$15,010
-
MMBtu
|
$808
-
Tgal
|
$273,015 | ||
TOTAL IMPLEMENTED | $32,416 | $6,131 |
$5,284
80,055
kWh
|
$12,475
-
kW-mo/yr
|
$15,010
-
MMBtu
|
$808
-
Tgal
|
$(-1,161.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Personnel Changes Savings |