| Assessment Year | 2010 |
|---|---|
| Principal Product | Fire hose |
| NAICS | 314999: All Other Miscellaneous Textile Product Mills |
| SIC | 3052: Rubber and Plastics Hose and Belting |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
150,000
ft2
|
| Annual Production | 300
thousand feet
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $125,013 | 2,264,900 |
kWh
|
$0.055 |
| Electricity Demand | $63,130 | 7,600 |
kW-mo/yr
|
$8.31 |
| Electricity Fees | $2,085 | - |
|
- |
| LPG | $20,730 | 614 |
MMBtu
|
$33.76 |
| Fuel Oil #2 | $74,519 | 5,590 |
MMBtu
|
$13.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,265 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,265 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,415 | $50 |
$1,007
18,315
kWh
|
$408
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $613 | $100 |
$692
12,587
kWh
|
$281
-
kW-mo/yr
|
- | $(-300.0) | $(-60.0) | |
| 03 | 2.4151: Develop a repair/replace policy | $1,256 | $2,538 |
$894
16,270
kWh
|
$362
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.2163: Use minimum steam operating pressure | $204 | $100 | - | - |
$204
-
MMBtu
|
- | - | |
| 05 | 2.7261: Install timers and/or thermostats | $1,539 | $736 |
$1,539
28,000
kWh
|
- | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $969 | $1,151 |
$690
12,547
kWh
|
$279
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.7135: Install occupancy sensors | $269 | $133 |
$269
4,896
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $6,265 | $4,808 |
$5,091
92,615
kWh
|
$1,330
-
kW-mo/yr
|
$204
-
MMBtu
|
$(-300.0) | $(-60.0) | ||
| TOTAL IMPLEMENTED | $6,265 | $4,808 |
$5,091
92,615
kWh
|
$1,330
-
kW-mo/yr
|
$204
-
MMBtu
|
$(-300.0) | $(-60.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs