ITAC Assessment: NC0409
ITAC logo
ITAC Assessment: NC0409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Fire hose
NAICS 314999: All Other Miscellaneous Textile Product Mills
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 150,000
ft2
Annual Production 300
thousand feet
Production Hrs. Annual 4,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,013 2,264,900
kWh
Electricity Demand $63,130 7,600
kW-mo/yr
Electricity Fees $2,085 -
LPG $20,730 614
MMBtu
Fuel Oil #2 $74,519 5,590
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,265 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,265

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,415 $50 $1,007
18,315
kWh
$408
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $613 $100 $692
12,587
kWh
$281
-
kW-mo/yr
- $(-300.0) $(-60.0)
03 2.4151: Develop a repair/replace policy $1,256 $2,538 $894
16,270
kWh
$362
-
kW-mo/yr
- - -
04 2.2163: Use minimum steam operating pressure $204 $100 - - $204
-
MMBtu
- -
05 2.7261: Install timers and/or thermostats $1,539 $736 $1,539
28,000
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $969 $1,151 $690
12,547
kWh
$279
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $269 $133 $269
4,896
kWh
- - - -
TOTAL RECOMMENDED $6,265 $4,808 $5,091
92,615
kWh
$1,330
-
kW-mo/yr
$204
-
MMBtu
$(-300.0) $(-60.0)
TOTAL IMPLEMENTED $6,265 $4,808 $5,091
92,615
kWh
$1,330
-
kW-mo/yr
$204
-
MMBtu
$(-300.0) $(-60.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings