Assessment Year | 2006 |
---|---|
Principal Product | Automotive catalysts |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 115 |
Plant Area |
98,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $469,472 | 7,079,700 |
kWh
|
$0.066 |
Electricity Demand | $35,508 | 15,046 |
kW-mo/yr
|
$2.36 |
Electricity Fees | $17,896 | - |
|
- |
Natural Gas | $531,836 | 42,360 |
MMBtu
|
$12.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,738 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,404 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4151: Develop a repair/replace policy | $6,708 | - |
$6,299
86,579
kWh
|
$409
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,347 | $100 |
$6,805
93,540
kWh
|
$442
-
kW-mo/yr
|
$(-600.0) | $(-300.0) | |
03 | 2.4239: Eliminate or reduce compressed air usage | $3,895 | $3,400 |
$3,658
50,280
kWh
|
$237
-
kW-mo/yr
|
- | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $10,125 | $22,000 |
$8,476
116,511
kWh
|
$1,649
-
kW-mo/yr
|
- | - | |
05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,239 | $5,000 |
$2,239
30,780
kWh
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $95 | $165 |
$95
1,315
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,060 | $5,000 |
$995
13,680
kWh
|
$65
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $269 | $283 |
$244
3,351
kWh
|
$25
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $30,738 | $35,948 |
$28,811
396,036
kWh
|
$2,827
-
kW-mo/yr
|
$(-600.0) | $(-300.0) | ||
TOTAL IMPLEMENTED | $28,404 | $30,783 |
$26,477
363,941
kWh
|
$2,827
-
kW-mo/yr
|
$(-600.0) | $(-300.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs