Assessment Year | 2003 |
---|---|
Principal Product | Power Transmission Components |
NAICS | 333612: Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing |
SIC | 3566: Speed Changers, Industrial High-Speed Drives, and Gears |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
140,000
ft2
|
Annual Production | 1,450,000
pieces
|
Production Hrs. Annual | 5,800
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $351,701 | 6,923,250 |
kWh
|
$0.051 |
Electricity Demand | $98,429 | 20,129 |
kW-mo/yr
|
$4.89 |
Electricity Fees | $13,122 | - |
|
- |
Natural Gas | $6,858 | 758 |
MMBtu
|
$9.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $91,498 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,523 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $5,523 | $50 |
$5,080
100,000
kWh
|
$443
-
kW-mo/yr
|
- | - | - | |
02 | 2.4226: Use / purchase optimum sized compressor | $9,935 | $4,065 |
$9,935
195,566
kWh
|
- | - | - | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $18,792 | $27,000 |
$16,624
327,244
kWh
|
$2,168
-
kW-mo/yr
|
- | - | - | |
04 | 4.212: Adopt in-house material generation | $56,248 | $120,000 |
$(-6,560.0)
(-129,120)
kWh
|
$(-1,056.0)
-
kW-mo/yr
|
- | $(-5,000.0) | $68,864 | |
05 | 2.4151: Develop a repair/replace policy | $204 | $150 |
$158
3,120
kWh
|
$46
-
kW-mo/yr
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $796 | $100 |
$1,498
29,496
kWh
|
$198
-
kW-mo/yr
|
$(-600.0) | $(-300.0) | - | |
TOTAL RECOMMENDED | $91,498 | $151,365 |
$26,735
526,306
kWh
|
$1,799
-
kW-mo/yr
|
$(-600.0) | $(-5,300.0) | $68,864 | ||
TOTAL IMPLEMENTED | $6,523 | $300 |
$6,736
132,616
kWh
|
$687
-
kW-mo/yr
|
$(-600.0) | $(-300.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs