ITAC Assessment: GT0215
ITAC logo
ITAC Assessment: GT0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product YARN
NAICS
n/a
SIC 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing)
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 3,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,814 1,424,971
kWh
Natural Gas $123,532 26,467
MMBtu
Fuel Oil #2 $2,492 368
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,019 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,678

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $11,255 $24,000 - $11,255
-
MMBtu
02 2.2441: Preheat boiler makeup water with waste process heat $852 $3,000 - $852
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $1,517 $572 - $1,517
-
MMBtu
04 2.7226: Use computer programs to optimize hvac performance $1,800 $4,000 $1,800
64,478
kWh
-
05 2.4133: Use most efficient type of electric motors $341 $539 $341
6,448
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $437 $1,000 - $437
-
MMBtu
07 2.2514: Cover open tanks $817 $2,000 - $817
-
MMBtu
TOTAL RECOMMENDED $17,019 $35,111 $2,141
70,926
kWh
$14,878
-
MMBtu
TOTAL IMPLEMENTED $16,678 $34,572 $1,800
64,478
kWh
$14,878
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs