| Assessment Year | 1996 |
|---|---|
| Principal Product | Aircraft Parts and Assemblies |
| NAICS |
n/a
|
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 58 |
| Plant Area |
69,000
ft2
|
| Annual Production | 1,000,000
pieces
|
| Production Hrs. Annual | 4,472
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $124,339 | 2,011,723 |
kWh
|
$0.062 |
| Electricity Demand | $13,216 | 4,636 |
kW-mo/yr
|
$2.85 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,854 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $33,088 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $717 | $120 |
$672
10,258
kWh
|
$45
-
kW-mo/yr
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $2,360 | $4,136 |
$1,914
31,067
kWh
|
$446
-
kW-mo/yr
|
- | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $145 | - |
$116
1,758
kWh
|
$29
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,815 | $39,642 |
$18,076
292,497
kWh
|
$1,739
-
kW-mo/yr
|
- | |
| 05 | 2.7241: Install outside air damper / economizer on hvac unit | $8,434 | - |
$8,434
114,009
kWh
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $743 | - |
$661
10,551
kWh
|
$82
-
kW-mo/yr
|
- | |
| 07 | 2.7135: Install occupancy sensors | $2,789 | $900 |
$2,789
45,135
kWh
|
- | - | |
| 08 | 2.7232: Replace existing hvac unit with high efficiency model | $11,663 | $8,000 |
$9,220
157,093
kWh
|
$2,443
-
kW-mo/yr
|
- | |
| 09 | 3.5313: Increase amount of waste recovered for resale | $1,188 | - | - | - |
$1,188
-
lb
|
|
| TOTAL RECOMMENDED | $47,854 | $52,798 |
$41,882
662,368
kWh
|
$4,784
-
kW-mo/yr
|
$1,188
-
lb
|
||
| TOTAL IMPLEMENTED | $33,088 | $40,662 |
$30,087
463,657
kWh
|
$1,813
-
kW-mo/yr
|
$1,188
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs