ITAC Assessment: AS0174
ITAC logo
ITAC Assessment: AS0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Aircraft Parts and Assemblies
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 58
Plant Area 69,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,472
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,339 2,011,723
kWh
Electricity Demand $13,216 4,636
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,854 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,088

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $717 $120 $672
10,258
kWh
$45
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $2,360 $4,136 $1,914
31,067
kWh
$446
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $145 - $116
1,758
kWh
$29
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $19,815 $39,642 $18,076
292,497
kWh
$1,739
-
kW-mo/yr
-
05 2.7241: Install outside air damper / economizer on hvac unit $8,434 - $8,434
114,009
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $743 - $661
10,551
kWh
$82
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $2,789 $900 $2,789
45,135
kWh
- -
08 2.7232: Replace existing hvac unit with high efficiency model $11,663 $8,000 $9,220
157,093
kWh
$2,443
-
kW-mo/yr
-
09 3.5313: Increase amount of waste recovered for resale $1,188 - - - $1,188
-
lb
TOTAL RECOMMENDED $47,854 $52,798 $41,882
662,368
kWh
$4,784
-
kW-mo/yr
$1,188
-
lb
TOTAL IMPLEMENTED $33,088 $40,662 $30,087
463,657
kWh
$1,813
-
kW-mo/yr
$1,188
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs