Assessment Year | 2010 |
---|---|
Principal Product | Bathtubs and Showers |
NAICS | 326191: Plastics Plumbing Fixture Manufacturing |
SIC | 3088: Plastics Plumbing Fixtures |
Sales Range | $10 M to 50M |
# of Employees | 113 |
Plant Area |
83,100
ft2
|
Annual Production | 75,789
pieces
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $201,679 | 2,619,628 |
kWh
|
$0.077 |
Natural Gas | $207,614 | 26,944 |
MMBtu
|
$7.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,152 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,442 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,667 | $200 |
$4,667
60,618
kWh
|
- | |
02 | 2.7135: Install occupancy sensors | $1,765 | $2,250 |
$1,765
22,925
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,227 | $6,400 |
$1,227
15,934
kWh
|
- | |
04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $15,389 | $33,705 | - |
$15,389
-
MMBtu
|
|
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $10,662 | $40,550 | - |
$10,662
-
MMBtu
|
|
06 | 2.2437: Recover waste heat from equipment | $10,185 | $10,900 | - |
$10,185
-
MMBtu
|
|
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $257 | $93 | - |
$257
-
MMBtu
|
|
TOTAL RECOMMENDED | $44,152 | $94,098 |
$7,659
99,477
kWh
|
$36,493
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,442 | $10,993 | - |
$10,442
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs