ITAC Assessment: UM0374
ITAC logo
ITAC Assessment: UM0374
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Bathtubs and Showers
NAICS 326191: Plastics Plumbing Fixture Manufacturing
SIC 3088: Plastics Plumbing Fixtures
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area 83,100
ft2
Annual Production 75,789
pieces
Production Hrs. Annual 4,368
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,679 2,619,628
kWh
Natural Gas $207,614 26,944
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,152 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,667 $200 $4,667
60,618
kWh
-
02 2.7135: Install occupancy sensors $1,765 $2,250 $1,765
22,925
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,227 $6,400 $1,227
15,934
kWh
-
04 2.7491: Insulate glazing, walls, ceilings, and roofs $15,389 $33,705 - $15,389
-
MMBtu
05 2.7491: Insulate glazing, walls, ceilings, and roofs $10,662 $40,550 - $10,662
-
MMBtu
06 2.2437: Recover waste heat from equipment $10,185 $10,900 - $10,185
-
MMBtu
07 2.7447: Install vinyl strip / high speed / air curtain doors $257 $93 - $257
-
MMBtu
TOTAL RECOMMENDED $44,152 $94,098 $7,659
99,477
kWh
$36,493
-
MMBtu
TOTAL IMPLEMENTED $10,442 $10,993 - $10,442
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs