ITAC Assessment: NC0244
ITAC logo
ITAC Assessment: NC0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Truck bodies and trailers
NAICS
n/a
SIC 3715: Truck Trailers
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 200,000
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,905 2,990,680
kWh
Electricity Demand $52,979 12,859
kW-mo/yr
Electricity Fees $2,056 -
Natural Gas $132,289 19,285
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,669 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,046

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4151: Develop a repair/replace policy $2,879 $2,331 $1,902
39,527
kWh
$977
-
kW-mo/yr
-
02 2.4225: Install common header on compressors $10,649 $17,871 $7,035
146,200
kWh
$3,614
-
kW-mo/yr
-
03 2.4226: Use / purchase optimum sized compressor $7,280 $1,350 $7,280
151,289
kWh
- -
04 2.2437: Recover waste heat from equipment $2,140 $2,000 - - $2,140
-
MMBtu
05 2.7134: Use photocell controls $167 $150 $107
2,214
kWh
$60
-
kW-mo/yr
-
06 2.9112: Use solar heat to heat water $3,554 $8,775 - - $3,554
-
MMBtu
TOTAL RECOMMENDED $26,669 $32,477 $16,324
339,230
kWh
$4,651
-
kW-mo/yr
$5,694
-
MMBtu
TOTAL IMPLEMENTED $3,046 $2,481 $2,009
41,741
kWh
$1,037
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs