ITAC Assessment: MA0098
ITAC logo
ITAC Assessment: MA0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product METAL PLATING OF SURFACE
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 76
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,462 1,483,880
kWh
Natural Gas $64,755 15,379
MMBtu
Fuel Oil #2 $32,578 8,414
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,465 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,004

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $977 $116 $977
16,413
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,853 $2,000 $3,853
65,358
kWh
- -
03 2.7261: Install timers and/or thermostats $3,607 $4,400 - - $3,607
-
MMBtu
04 2.7226: Use computer programs to optimize hvac performance $5,581 $10,000 $5,581
94,666
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,880 $3,100 - $2,880
-
MMBtu
-
06 2.2511: Insulate bare equipment $4,113 $2,238 - $4,113
-
MMBtu
-
07 2.2514: Cover open tanks $3,570 $1,122 - $3,570
-
MMBtu
-
08 2.4133: Use most efficient type of electric motors $1,884 $1,333 $1,884
31,946
kWh
- -
TOTAL RECOMMENDED $26,465 $24,309 $12,295
208,383
kWh
$10,563
-
MMBtu
$3,607
-
MMBtu
TOTAL IMPLEMENTED $18,004 $11,209 $6,714
113,717
kWh
$7,683
-
MMBtu
$3,607
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs