Assessment Year | 1987 |
---|---|
Principal Product | METAL PLATING OF SURFACE |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 76 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,462 | 1,483,880 |
kWh
|
$0.059 |
Natural Gas | $64,755 | 15,379 |
MMBtu
|
$4.21 |
Fuel Oil #2 | $32,578 | 8,414 |
MMBtu
|
$3.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,465 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,004 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $977 | $116 |
$977
16,413
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,853 | $2,000 |
$3,853
65,358
kWh
|
- | - | |
03 | 2.7261: Install timers and/or thermostats | $3,607 | $4,400 | - | - |
$3,607
-
MMBtu
|
|
04 | 2.7226: Use computer programs to optimize hvac performance | $5,581 | $10,000 |
$5,581
94,666
kWh
|
- | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,880 | $3,100 | - |
$2,880
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $4,113 | $2,238 | - |
$4,113
-
MMBtu
|
- | |
07 | 2.2514: Cover open tanks | $3,570 | $1,122 | - |
$3,570
-
MMBtu
|
- | |
08 | 2.4133: Use most efficient type of electric motors | $1,884 | $1,333 |
$1,884
31,946
kWh
|
- | - | |
TOTAL RECOMMENDED | $26,465 | $24,309 |
$12,295
208,383
kWh
|
$10,563
-
MMBtu
|
$3,607
-
MMBtu
|
||
TOTAL IMPLEMENTED | $18,004 | $11,209 |
$6,714
113,717
kWh
|
$7,683
-
MMBtu
|
$3,607
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs