ITAC Assessment: NC0226
ITAC logo
ITAC Assessment: NC0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Phone cable
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 475
Plant Area 500,000
ft2
Annual Production 35,900,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $868,921 36,138,000
kWh
Electricity Demand $851,872 59,726
kW-mo/yr
Electricity Fees $77,282 -
Natural Gas $86,642 9,294
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,519 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.4151: Develop a repair/replace policy $10,828 $12,834 $5,866
244,432
kWh
$4,962
-
kW-mo/yr
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,348 $500 $17,440
726,600
kWh
$14,800
-
kW-mo/yr
$(-28,892.0)
-
MMBtu
- -
03 2.2511: Insulate bare equipment $2,071 $407 $1,142
47,583
kWh
$929
-
kW-mo/yr
- - -
04 2.2136: Install / repair insulation on steam lines $1,800 $400 $993
41,371
kWh
$807
-
kW-mo/yr
- - -
05 2.2511: Insulate bare equipment $1,122 $2,225 $607
25,310
kWh
$515
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $279 $150 $154
6,423
kWh
$125
-
kW-mo/yr
- - -
07 2.4237: Substitute compressed air cooling with water or air cooling $23,668 $26,000 $12,802
533,400
kWh
$10,866
-
kW-mo/yr
- - -
08 2.7251: Reduce air conditioning load by evaporating water from roof $93,403 $(-312,000.0) $21,072
877,998
kWh
$52,986
-
kW-mo/yr
- $(-6,655.0)
-
Tgal
$26,000
TOTAL RECOMMENDED $136,519 $(-269,484.0) $60,076
2,503,117
kWh
$85,990
-
kW-mo/yr
$(-28,892.0)
-
MMBtu
$(-6,655.0)
-
Tgal
$26,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs