ITAC Assessment: CO0081
ITAC logo
ITAC Assessment: CO0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CONCRETE, ASPHALT, SAND
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area
n/a
Annual Production 150,000
ton
Production Hrs. Annual 2,340
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,133 1,051,876
kWh
Natural Gas $87,295 15,453
MMBtu
Fuel Oil #2 $83,003 22,785
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,588

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $6,351 $200 - $6,351
-
MMBtu
-
02 2.6212: Turn off equipment during breaks, reduce operating time $1,685 $300 $1,685
17,878
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,132 - $1,132
12,016
kWh
- -
04 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $4,887 $15,000 - $4,887
-
MMBtu
-
05 2.3212: Optimize plant power factor $1,533 $3,931 $1,533
-
kWh
- -
06 2.8223: Add air shields to trucks to increase fuel mileage $3,316 - - - $3,316
-
MMBtu
TOTAL RECOMMENDED $18,904 $19,431 $4,350
29,894
kWh
$11,238
-
MMBtu
$3,316
-
MMBtu
TOTAL IMPLEMENTED $15,588 $19,431 $4,350
29,894
kWh
$11,238
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs