ITAC Assessment: NC0144
ITAC logo
ITAC Assessment: NC0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product hand held electric power tools
NAICS
n/a
SIC 3546: Power-Driven Handtools
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 124,880
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,255 7,926,143
kWh
Electricity Demand $207,157 18,414
kW-mo/yr
Electricity Fees $1,071 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,102 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,408

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,673 $14,934 $2,880
80,012
kWh
$2,700
-
kW-mo/yr
$(-1,907.0)
-
MMBtu
- - - -
02 2.6231: Utilize controls to operate equipment only when needed $2,664 $1,000 $2,664
74,150
kWh
- - - - - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,696 $12,000 $1,120
31,067
kWh
$2,799
-
kW-mo/yr
$(-1,223.0)
-
MMBtu
- - - -
04 2.4226: Use / purchase optimum sized compressor $2,617 $4,731 $2,617
72,685
kWh
- - - - - -
05 3.5313: Increase amount of waste recovered for resale $113 $200 - - - - - $113
-
lb
-
06 3.4155: Meter waste water $1,464 $200 - - - $1,464
-
Tgal
- - -
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $5,550 $2,700 - - - - - - $5,550
08 3.3131: Use evaporation to concentrate material $2,325 $12,000 - - $(-225.0)
-
MMBtu
- $2,550
-
gal
- -
TOTAL RECOMMENDED $21,102 $47,765 $9,281
257,914
kWh
$5,499
-
kW-mo/yr
$(-3,355.0)
-
MMBtu
$1,464
-
Tgal
$2,550
-
gal
$113
-
lb
$5,550
TOTAL IMPLEMENTED $12,408 $8,831 $5,281
146,835
kWh
- - $1,464
-
Tgal
- $113
-
lb
$5,550
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Primary Raw Material Savings