Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Gears and Pinions
NAICS
n/a
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 48,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 4,590
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,545 716,470
kWh
Electricity Demand $30,678 2,507
kW-mo/yr
Electricity Fees $9,356 -
Natural Gas $33,245 3,449
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,186 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,245 $900 n/a $1,404
28,635
kWh
$841
-
kW-mo/yr
- - - - -
02 2.4221: Install compressor air intakes in coolest locations $272 $150 n/a $131
2,681
kWh
$141
-
kW-mo/yr
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,208 $14,105 n/a $1,299
26,514
kWh
$912
-
kW-mo/yr
- - $2,933 $64 -
04 2.7111: Reduce illumination to minimum necessary levels $4,187 $14,750 n/a $2,914
59,476
kWh
$1,748
-
kW-mo/yr
- - $(-125.0) $(-350.0) -
05 2.7135: Install occupancy sensors $1,046 $501 n/a $934
19,051
kWh
$112
-
kW-mo/yr
- - - - -
06 2.5111: Convert from indirect to direct fired systems $11,745 $14,000 n/a - - $5,745
-
MMBtu
- $6,000 - -
07 2.3191: Use demand controller or load shedder $3,070 $2,812 n/a - $3,070
-
kW-mo/yr
- - - - -
08 3.5311: Recover and reuse waste material $14,413 $72,000 n/a - - - $13,992
-
gal
- - $421
TOTAL RECOMMENDED $42,186 $119,218 $6,682
136,357
kWh
$6,824
-
kW-mo/yr
$5,745
-
MMBtu
$13,992
-
gal
$8,808 $(-286.0) $421
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings