ITAC Assessment: BS0064
ITAC logo
ITAC Assessment: BS0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Concrete Masonry Units
NAICS 327331: Concrete Block and Brick Manufacturing
SIC 3271: Concrete Block and Brick
Sales Range $5
M
to 10
M
# of Employees 29
Plant Area 65,000
ft2
Annual Production 548,000
pieces
Production Hrs. Annual 2,720
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,614 941,000
kWh
Electricity Demand $24,113 4,130
kW-mo/yr
Electricity Fees $202 -
Natural Gas $56,338 7,644
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,792

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,694 $503 $34
625
kWh
$1,660
-
MMBtu
02 2.2437: Recover waste heat from equipment $5,555 $6,149 - $5,555
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $98 $200 $98
1,814
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,050 $1,378 $1,050
19,516
kWh
-
05 2.4322: Use or replace with energy efficient substitutes $1,284 $2,208 $1,284
23,872
kWh
-
TOTAL RECOMMENDED $9,681 $10,438 $2,466
45,827
kWh
$7,215
-
MMBtu
TOTAL IMPLEMENTED $1,792 $703 $132
2,439
kWh
$1,660
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs