ITAC Assessment: NC0026
ITAC logo
ITAC Assessment: NC0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Re-manufactured Auto Parts
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 104,410
ft2
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,297 1,226,553
kWh
Natural Gas $69,170 7,098
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,809 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,535

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $972 $210 $972
14,654
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,139 $1,646 $3,139
46,893
kWh
-
03 2.2414: Use waste heat from hot flue gases to preheat $17,901 $25,000 - $17,901
-
MMBtu
04 2.4226: Use / purchase optimum sized compressor $1,373 $1,500 $1,373
21,395
kWh
-
05 2.6231: Utilize controls to operate equipment only when needed $1,424 $500 $1,424
21,395
kWh
-
TOTAL RECOMMENDED $24,809 $28,856 $6,908
104,337
kWh
$17,901
-
MMBtu
TOTAL IMPLEMENTED $5,535 $2,356 $5,535
82,942
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs