ITAC Assessment: NC0001
ITAC logo
ITAC Assessment: NC0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Elastic, Lace
NAICS
n/a
SIC 2258: Lace and Warp Knit Fabric Mills
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,111 978,312
kWh
Natural Gas $56,535 11,240
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,854 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,595

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,139 $1,577 $4,139
53,048
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,100 $500 - $3,100
-
MMBtu
03 2.7444: Close holes and openings in building such as broken windows $745 $300 $745
9,672
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $588 $10 $588
7,327
kWh
-
05 2.6231: Utilize controls to operate equipment only when needed $162 $100 $162
-
kWh
-
06 2.7491: Insulate glazing, walls, ceilings, and roofs $2,120 $4,800 $2,120
10,551
kWh
-
TOTAL RECOMMENDED $10,854 $7,287 $7,754
80,598
kWh
$3,100
-
MMBtu
TOTAL IMPLEMENTED $4,595 $910 $1,495
16,999
kWh
$3,100
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs